visits

Preform mold


Latest Update: 2019-9-3 20:14:03
Machine Color:
Tags :-


yongchang molds pet Preform mould with good cooling effect,our designers pay attention on the cooling system, water lines distribute balance. it will make the products forming fast and not easy to deformation.


Mold production process

1. Product design (customers can provide complete 3D files or sample)

2. Rapid prototyping of products (if needed)

3. Mold design

4. Mold inspection and mold flow analysis

5. Mold processing (including the use of computer numerical control (CNC) and EDM technology)

6. The first tryout

7. Mold modification and skin texture

8. Delivery

FAQ

1. Q: Are you trading company or manufacturer ?

    A: We are factory.

2. Q: How long is your delivery time ?

    A: Generally it is 30-50 after client payment deposit and also confirm drawing. Different mold with different delivery time.

3. Q: Can you help us with the design ?

    A: YES,We’ll be free to help with you design based on your 3D/Sample .

4. Q: Do you provide samples ? is it free or extra ?

    A: YES,we will be send free sample for you confirm after we finished mold and test it .5. Q: What is your terms of payment ?

    A: T/T(50% T/T first payment + 50% T/T at samples confirmation , before shipment.).

    If you have another question, pls feel free to contact us as below:

6. Q: What size range of molds can you make ?

     A: The mold can be up to 4 meters in length, 2.8 in width and 40 tons in weight .

7. Q: What’s the format of file is available for you ?

     A: We can accept different file formats such as IGES, DXF, DWG, STP, PRT, X_T, PDF, etc .

8. Q: Which plastic materials do you use ?

      A: ABS, PP, PC, PE, HDPE, POM, PA6, PA66, PA6+GF, PS, PMMA, TPU, TPE, PVC, etc. We have extensive experience in the injection molding process of these materials, and adjust the injection molding parameters to get the perfect plastic products.

9. Q: Mold packaging and shipping methods ?

      A: When the mold is finished, we will apply a layer of anti-rust paint on the surface, then wrap it in plastic film, wrap it and put it into a sterilized wooden box.

      Additional Documents:1. A1 paper size assembly drawing; 2. Electrode description; 3. Hanging ring, screw description; 4. Material proof; 5. Mold brake device and other necessary accessories.

10. Q: Do you sign a confidentiality agreement ?

      A: Yes,We understand the importance of design to you. Signing a confidentiality agreement is also our company’s policy. We may not disclose or copy any design or ideas about your company’s products or your company’s information to third parties without your permission .


Mould Name     plastic injection mould and SMC/BMC compression mould
Mould Cavity1*Multi-cavity,depend on your requirement or machine specification
Mould Steel S50C/P20H/718/H13/S136/2316/2738etc
Steel Hardness Steel Hardness
Mould Base Mould Base
Mould Runner Hot/Cold Runner 【Compression mould without runner,heating will oil or electric
Hot Runner Type China Hot Runner,YUDO, Husky, Synventive,Thermoplay,Ewikon, Mold Master,DME
Gate Point Gate, Side Gate, direct gate way,Sub-Gate,Tab Gate, Fan Gate
Ejection Stripper Plate, Ejection Block, Ejectors Pins,gas,Cylinder
Mould Life》300,000 Shots ,Different steel with different mold life
Production Time Production Time
Mould Parts  Standard Mold Parts
Mould Quality LevelsLevel A quality(Highest Level Quality), Level B quality(Middle Level Quality), Level C quality(Lowest Level Quality) , different level with different price
Attention When you send us the mould inquiry, please offer the following information:         1) Quality level you choose: Level A/Level B/Level C        2) Photo together with dimension/ drawing design
Mould Quality Control     For the Q/C of mould, there are 3 steps:        1.Mould Material Q/C        - Mould Steel Checking,Standard Spare Parts Checking        2. Mould Making Process Q/C        - Design checking ,Each part of mould’s size checking after machining according to 2D drawing , Mould testing        3.Check with customer’s requirement again before mould shipping.

Reviews